Spectra Energy Communications – Grizzly Valley

Datoff Bros. Construction
Tags: CivilIndustrial

Communication site upgrades were done for Spectra Energy with Ledcor Technical Services Ltd in the Grizzly Valley are near Tumbler Ridge, BC.  An access road was built for construction as one of the two sites was helicopter access only.  Ormat technology was used to maintain a power supply for the large 48VDC battery banks.  Construction started in early October and progressed through into January 2012.